Someone with these skills can:
Explain the overall information flow among
engineering stakeholders surrounding
equipment and piping layout
Define the main stakeholder purpose and
immediate downstream users of:
Block Flow Diagram
Process Flow Diagram
P&ID Diagram
Piping Material Specification
Equipment Data and Drawings
Explain the overall information flow among
engineering stakeholders surrounding
equipment and piping layout
Define the main stakeholder purpose and
immediate downstream users of:
Block Flow Diagram
Process Flow Diagram
P&ID Diagram
Piping Material Specification
Equipment Data and Drawings
Someone with these skills can:
Explain how design is valued on projects
Define the outcomes of the Front End
Loading Process and the function of
review “gates”
Contrast the Front End Engineering
Design process with the classical “Project
Phases” concept of design
List sources of project data for design
Explain how design is valued on projects
Define the outcomes of the Front End
Loading Process and the function of
review “gates”
Contrast the Front End Engineering
Design process with the classical “Project
Phases” concept of design
List sources of project data for design
Someone with these skills can:
Explain why the following documents
generally precede piping design:
Block Flow Diagram (BFD)
Process Flow Diagram (PFD)
Piping and Instrumentation Diagram (P&ID)
Equipment Layout
List which documents are mainly derived
from the PFD
Define the major documents that must be
on hand for piping layout to proceed
Explain why the following documents
generally precede piping design:
Block Flow Diagram (BFD)
Process Flow Diagram (PFD)
Piping and Instrumentation Diagram (P&ID)
Equipment Layout
List which documents are mainly derived
from the PFD
Define the major documents that must be
on hand for piping layout to proceed
Someone with these skills can:
Explain the documents needed to complete
a Process Equipment Layout and a Piping
Layout
Explain what documents are derived from a
completed Piping Layout and their end
user(s)
Explain what information on Piping Layout
impacts or is used by Operations and
Maintenance
Explain the documents needed to complete
a Process Equipment Layout and a Piping
Layout
Explain what documents are derived from a
completed Piping Layout and their end
user(s)
Explain what information on Piping Layout
impacts or is used by Operations and
Maintenance